New subway line drilled through in Beijing
Share - WeChat
BEIJING -- The entire tunnel of Beijing Subway Line 17 was drilled through after the middle section of the tunnel was bored through on Monday, its builder China Railway 14th Bureau Group Corporation Limited announced.
Beijing Subway Line 17 is a major transportation artery that runs north to south in the Chinese capital, where about 21.9 million people live.
With a total length of 49.7 kilometers, Line 17 is designed to have 21 stations. The northern and southern sections of the line opened to traffic in 2023 and in 2021.
Once the entire line is operational in the future, it is expected to alleviate traffic pressure on Line 5 and Line 10.
- Fujian ensures water security for Jinmen with over 50 million metric tons delivered
- Hongqiao airport upgrades services for inbound and transit passengers
- Zhengzhou Zoo serves ice, popsicles to animals amid heatwave
- Military personnel join flood rescue after reservoirs overflow in Guangxi
- Mainland criticizes DPP of escalating tensions over coast guard patrols
- China to resolutely punish 'Taiwan independence' separatist forces: spokesman































