Global EditionASIA 中文双语Français
China
Home / China / Environment

Power stations along desert highway near completion

By  Mao Weihua in Urumqi and Xing Wen in Beijing | chinadaily.com.cn | Updated: 2022-04-05 15:35
Share
Share - WeChat
Solar panels are installed alongside the the Tarim Desert Highway in the Xinjiang Uygur autonomous region to help water plants. [Photo provided to chinadaily.com.cn]

Construction of a zero-carbon emission project that aims to build 86 solar power stations along the Tarim Desert Highway in the Xinjiang Uygur autonomous region is set for completion this month.

The 566-kilometer highway traverses the Taklamakan Desert, the world's second-largest shifting sand desert.

A 436-km "green wall" more than-70-meter wide, formed by 20 million trees and shrubs, was completed on both sides of the highway in 2005 by Tarim Oilfield to protect the highway from sand.

As a replacement for diesel power generation, the clean energy power stations will help pump underground water to irrigate the greenbelt.

It is estimated that more than 1,000 tons of diesel fuel will be saved every year, and annual carbon dioxide emissions will be reduced by around 3,410 tons after the solar power generation system is put into use.

1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US