Global EditionASIA 中文双语Français
China
Home / China / Xizang mudslide

Over 100 power repair personnel deployed to Gyirong after mudslide

By Daqiong in Lhasa and Wang Songsong | chinadaily.com.cn | Updated: 2026-08-28 18:05
Share
Share - WeChat
State Grid Xizang Electric Power Co personnel use a drone to inspect power lines in Gyirong township, Shigatse. [Photo provided to chinadaily.com.cn]
|<< Previous 1 2 3 4 5   
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US