Global EditionASIA 中文双语Français
Business
Home / Business / Power focus

Huainan-Shanghai UHV AC Demonstration Project operating safely for 4,000 days

chinadaily.com.cn | Updated: 2024-09-11 16:17
Share
Share - WeChat
Staff members of State Grid Anhui Extra High Voltage Company carry out equipment maintenance at the UHV Wuhu Station. [Photo provided to chinadaily.com.cn]

During this summer's peak load period, the Wuhu Station's Hu'an double-line reached a record-breaking maximum load of 8.9 million kilowatts. Huainan Station dispatched a peak total load of 5.59 million kilowatts, with a single main transformer's maximum load reaching 1.71 million kilowatts. Amid the challenges posed by high temperatures, heavy loads, and severe convective weather, the two ultra-high voltage (UHV) stations meticulously devised a power supply enhancement plan for peak load periods. They consistently enhanced the operational and maintenance support for their equipment. Beyond routine human-machine inspections and specialized checks on critical equipment, they employed various methods like manual open-box inspections, infrared defect tracking, and drone inspections to ensure all-encompassing health monitoring of their equipment. This proactive approach enabled them to promptly identify and swiftly address multiple malfunctions, thereby ensuring the power grid's secure and stable operation during the peak load period.

|<< Previous 1 2 3   
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE