USEUROPEAFRICAASIA 中文双语Français
Home / China

Team tackles ice in 20-km railway tunnel

By Sun Ruisheng in Taiyuan and Wang Xiaoyu in Beijing | China Daily | Updated: 2019-02-13 07:30

For nearly a decade, a team of technicians has spent the winter months shoveling and removing ice from a railway tunnel in Shanxi province to safeguard passengers' trips.

The technicians are in charge of patrolling and maintaining all the bridges, tunnels, culverts and roadbeds along the Lyuliang section of the Taiyuan-Zhongwei-Yinchuan railway, which stretches 165 kilometers across mountainous terrain in northern China.

During the grueling winter months, when temperatures in the 20-km tunnel can plummet to as low as -19 C, the technicians are responsible for clearing snow and ice from the railway tracks.

Team tackles ice in 20-km railway tunnel

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US