USEUROPEAFRICAASIA 中文双语Français
Home / Comment

Subsidence shows construction needs supervising

China Daily | Updated: 2015-08-18 07:37

A WORKER WAS KILLED last week at a subway construction site in Dongguan, Guangdong province, when 300 square meters of land in the downtown area subsided, creating a hollow pit dozens of meters deep in a few seconds. Land subsidence has hit the construction site six times in the past three years. Comments:

The recent typhoon and rainstorm raised the level of the groundwater sharply. The geological conditions under this section of road are poor, as there is a thick layer of sand which can be easily washed away by water. The subsidence will not affect the subway's operation in the future, and will not delay the construction. And if the safety standards cannot be met, the subway will not be put into operation.

A spokesperson for the Guangdong Pearl River Delta Intercity Rail Transport Co Ltd, Dongguan, August 16

Subsidence shows construction needs supervising

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US