USEUROPEAFRICAASIA 中文双语Français
Home / Mosaic

Tunnel vision: Hot, humid and noisy

By Ma Chao | China Daily | Updated: 2010-06-03 07:50

The odor was a mixture of steam, petrol, mud and metal, mixed with something quite unidentifiable. And it was hot and humid.

It was also so noisy that I had to shout to be heard by the person standing just half a meter away. We were 15 m underground, near a tunnel-boring machine working to slowly lengthen Line 10 as part of its second phase, and part of Beijing's gigantic subway building project.

Tunnel vision: Hot, humid and noisy

The new tunnel, 6 m in diameter, is nearly half a km long and is served by a railway track to ferry parts into it, and take the mud and debris out.

Tunnel vision: Hot, humid and noisy

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US