Across China: Shanghai
China Daily | Updated: 2009-04-17 07:39
Hongqiao airport facelift
The main structure of Shanghai Hongqiao Airport's second terminal is ready, barring the decoration.
The facility has a super-built floor area of 364,000 sq m, more than four times that of the existing terminal. The new terminal and runway are scheduled to be in operation by next March, ahead of the World Expo 2010 in Shanghai.
Photo