USEUROPEAFRICAASIA 中文双语Français
Home / Ethiopia Special

Project Construction

China Daily | Updated: 2007-08-08 07:15

Beijing-Tianjin high-speed train

Construction:

July 4, 2005, to end of 2007

Trial runs: Early 2008

Opening: August 1, 2008

Cost:

12.3 billion yuan ($1.6 b)

Total length:

117 km

Travel time:

29 minutes

Special feature:

Railway lines are built on raised pylons to pass over Beijing's main roads

Terminal 3 at Beijing Capital International Airport

Contruction:

March 28, 2004, to 2007

Trial runs:

February 2008

Cost:

16.7 billion yuan ($2.1 b)

Special features:

The world's biggest terminal to date; it will facilitate a 15-minute train ride to the downtown area

Beijing Olympics special lanes

Total length:

More than 200 km

Travel time:

Less than 30 minutes from Olympic Village and media center to Olympic venues

Special feature:

Three expressways linking the downtown area and the airport

New expressways

Total length:

More than 100 km to be built in 2007, another 260 km expected by 2010

Cost:

40 billion yuan ($5,28b)

Sign boards

Total number:

More than 6,500 boards to be replaced and rewritten throughout the city

Cost:

More then 10 million yuan ($1.3m)

(China Daily 08/08/2007 page40)

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US