State Grid Zhenjiang enhances distribution line construction with drones
Workers from State Grid Zhenjiang Power Supply Company employed drones to string pilot ropes at the construction site of the 10 kV Xinbei 162 Line conversion project from a single-circuit to a double-circuit line on Nov 9, steadily advancing the wiring work.
This innovative technique directly tackled the challenges posed by conventional methods. Previously, navigating lines over existing power and communication cables risked damage, while working through densely wooded areas often harmed the local ecosystem and significantly increased both time and labor costs.
For this project, which required the installation of 600 meters of three-phase wiring, drones provided an ideal solution. The unmanned aircraft precisely placed the pilot ropes along the predetermined route.
The entire operation was not only faster but also safer, minimizing potential impact on the surrounding environment and infrastructure.
This approach greatly shortened the construction period, reduced labor and time costs, and enhanced both the efficiency and precision of the project.
Since the beginning of this year, the company has completed seven drone-assisted wiring projects, totaling 3.25 kilometers of wiring.
Looking forward, the company will continue to focus on construction modernization and machinery substitution to further improve construction efficiency, reduce costs, and provide a reliable power supply for socio-economic development.




