Global EditionASIA 中文双语Français
Business

Key line

China Daily | Updated: 2026-09-17 00:00
Share
Share - WeChat
Power workers from State Grid Zhumadian operate an aerial drone to conduct smart inspections of a 10-kilovolt transmission line in Shangcai county, Henan province, in a bid to nip hidden hazards in the bud, such as overhanging branches and obstructive debris. As autumn harvest approaches, they strengthened checks on the operation status of towers, insulators and wires, trying to eliminate hidden risks to meet the growing power needs. TANG PEISEN/FOR CHINA DAILY

Today's Top News

Editor's picks

Most Viewed

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US