Global EditionASIA 中文双语Français
Business

Power play

China Daily | Updated: 2026-08-04 00:00
Share
Share - WeChat
Staffers from State Grid Changji conduct equipment renovation at the 220-kilovolt Shiqiantan substation in the Wucaiwan area in the Xinjiang Uygur autonomous region. Adhering to the high-voltage electrical installation standards, the on-site workers rigorously manage key aspects to eliminate potential safety hazards in equipment connections, ensuring reliable power supply to the Wucaiwan industrial zone and surrounding areas in Changji Hui autonomous prefecture. AO LIN/FOR CHINA DAILY

Today's Top News

Editor's picks

Most Viewed

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US