-
Project toward producing 20,000tons/annual battery plate
This project mainly produces valve control seal sodium salt high-energy battery.
-
Project toward producing solar and wind power integrated series products
This project plans to cover an area of 8.33 hectares with a building area of 50,000 square meters, and it mainly build workshop, office building, scientific research building, dormitory building for employees and auxiliary facilities.
-
200MW/annual amorphous silicon thin film solar photoelectric template
As a new kind of semiconductor film material, the amorphous silicon belongs to new energy material and electronic information new material.
-
The second and third-phase production of glass insulator
This project is divided into three phases to build. The first phase is to build one kiln and one production line, and the second phase is to build one kiln and two production lines, and the third phase is to newly build one kiln and two production lines.
-
3 million sets/annual optronics
This project plans to cover an area of 3.33 hectares with a building area 20,000 square meters, and it mainly builds production workshop, warehouse and various ancillary facilities.
-
Digital water conservancy engineering equipment
This project plans to cover an area of 66.7 hectares with a building area of 400,000 square meters.
-
150sets/annual vertical pressure filter
This project plans to build steel structure plant workshop and open-air cross, and newly increase production building area of 30,120 square meters as well.
