|
Zhangyang Aqueduct of Dongjiang—Shenzhen Water Supply Renovation Project, China
![]() |
Construction period:2000-2003 Total length of aqueduct:1,000m Minimum thickness of the aqueduct wall:30cm Description:the largest cast-in-place pre-stressed concrete U-shaped thin-shell aqueduct of the same type in the world, won Luban Award, the top construction and engineering quality award in China. |







