Xinjiang Oilfield marks 70 years of operation

Workers 'persevere' to meet 20-million-ton annual production target

China Daily | Updated: 2025-04-23 08:51
Share
Share - WeChat
Workers approach an oil well in the Cainan Operation Area on April 6. LYU DIANJIE/YANG CHUYI/FOR CHINA DAILY

They are optimizing development plans using big data, conducting core experiments at well sites in the eighth area to provide crucial data for the development of 55 wells in old areas. Grassroots production teams are stationed at old wells to accelerate new well yield, and the logistics department is strengthening material allocation and equipment maintenance to enhance production efficiency.

At noon, patrol team leader Zhang Lei and his team inspected the photovoltaic panel array. The panels coexisting with the endless red oil wells symbolize the oilfield's transition toward green practices. The installed solar capacity in the Xinjiang Oilfield has reached 200,000 kilowatts, with the annual power generation meeting 15 percent of production needs.

|<< Previous 1 2 3 4 5 6 7 8 9 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US