Global EditionASIA 中文双语Français
Business

Briefly

China Daily | Updated: 2021-11-30 00:00
Share
Share - WeChat

Key part of pipeline starts operations

Construction of the key Shanxi-Hebei section of the 623-kilometer Shenmu-Anping coal bed methane or CBM pipeline, China's longest such project, finished on Monday, taking it one step closer to launch of operations of the entire project, said China United Coalbed Methane Corp, its operator. The Shanxi-Hebei section, which began operations on Monday, spans 548.95 kilometers with a designed annual gas transmission capacity of 5 billion cubic meters. The pipeline will help ensure adequate gas supplies during the oncoming heating season, said China United Coalbed Methane Corp, a subsidiary of China National Offshore Oil Corp.

Reverse repos net 100b yuan, stabilize liquidity

The People's Bank of China, the central bank, injected 100 billion yuan ($15.7 billion) into the financial system via seven-day, 2.2 percent reverse repos on Monday, with a view to keep liquidity in the banking system reasonably stable.

Xinhua - China Daily

Today's Top News

Editor's picks

Most Viewed

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US