Contact Us | 中文
Your’re Here : Home > Project updates

No.1 and No.2 radial gates of Pakistan N-J Project opened successfully

Updated: 2016-04-07

On March 30, No.1 and No.2 radial gates of the dam of Neelum–Jhelum (N-J) Hydropower Project were opened successfully. The opening ceremony was attended by Zafar Mahmood, President of Water and Power Development Authority (WAPDA) of Pakistan, and General Zubair, CEO of N-J Project.

No.1 and No.2 radial gates are both 15m high and 12m wide at the weight of over 400 tons. Zafar Mahmood, grateful for CGGC people's diligent efforts, believed CGGC to be a convincible contractor of WAPDA. He hoped CGGC could exert persistent effort in proceeding with all jobs of N-J Hydropower Project to build it to be CGGC’s benchmarking project in Pakistan.

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright © 2013 China Gezhouba (Group) Corporation. All rights reserved.