Electromechanical Equipment Installation at the Shuibuya Hydropower Station, China

 Electromechanical Equipment Installation at the Shuibuya Hydropower Station, China

Electromechanical Equipment Installation at the Shuibuya Hydropower Station, China

Description:CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

 

 