BIZCHINA / Investment

Dezhou-Shangqiu (northern section) Expressway construction project
(sdfiw.gov.cn)
Updated: 2006-05-18 10:54

Project Name:
  Dezhou-Shangqiu (northern section) Expressway construction project[2005] [Key Project] [Jinan]
 
 Cooperation Form:
  It is tended to adopt the form of joint venture or cooperative construction. This project is the national trunk highway, so its investment and construction need to be submitted to the State for examination and approval.
 
 Project Unit:
  Shandong Transport Department Highway Bureau
 
 Brief Introduction to the Project Unit:
  The construction unit of this project is Shandong Transport Department Highway Bureau that is under the control of Shandong Transport Department. It is mainly responsible for roads construction, maintenance, administration and maintenance fee and toll collection of the whole province.

 
 Links:  

 jinan.htm   www.sdjt.gov.cn  

 
 Trade classification:
  Infrastructures and City Public Utilities
 
 Brief Introduction to the Project:
  Project scale

The expressway is about 183km long totally, with two-way 4 lanes, up to the expressway standard.

Construction condition

This project is the important integral part of “One Loop” and “One-crosswise” among the planned high-grade highway network of Shandong Province, i.e. “five lengthwise highroads connecting with four crosswise ones, and one loop around Shandong”, starting from the Dezhou Round-city southern line on the north, terminating to the border between Yanggu County and Fanxian County, on the way intersecting with three east-to-west expressways such as Qihe-Xiajin Section of Qingdao-Yinchuan Expressway - the national truck highway, Linqing-Xiajin Expressway under the planning, and Liaocheng Section of Qingdao-Honjirap Highway-the national key road and forming a fast through channel running from north to south, at the same time organically connecting the highways within the region so as to reach everywhere in all directions, which plays significant role in improving the layout of regional highway network, suiting to growth of traffic volume and bringing the whole benefits of highway network into play.

Total investment and fund resource

It is estimated that the total project investment is 771.08 million US dollars, with the project capital not less than 35%.

Market and economic benefit analysis and forecast

The project’s internal rate of return is 8.1%, with about 17 years of investment recovery period. With better economic benefits, this project can have certain risk resistance capacity.

 
Liaison:

Add: No. 19, Shungeng Road, Jinan City
Post code: 65306; 250002
Person to contact : Dong Yan, Mo Tao, Chang Ying
Tel: +86-531-5693095 2980940
Fax: +86-531-2973353 2973640
http: www.sdjt.gov.cn
E-mail: mut_gl@sdjt.gov.cn


(For more biz stories, please visit Industry Updates)