Project Name:
Dezhou-Shangqiu (northern section) Expressway
construction project[2005] [Key Project] [Jinan]
Cooperation Form:
It is tended to adopt the form of joint venture or cooperative
construction. This project is the national trunk highway, so its investment and
construction need to be submitted to the State for examination and
approval.
Project Unit:
Shandong Transport Department
Highway Bureau
Brief Introduction to the Project Unit:
The
construction unit of this project is Shandong Transport Department Highway
Bureau that is under the control of Shandong Transport Department. It is mainly
responsible for roads construction, maintenance, administration and maintenance
fee and toll collection of the whole province.
Links:
jinan.htm www.sdjt.gov.cn
Trade classification:
Infrastructures and City Public
Utilities
Brief Introduction to the Project:
Project
scale
The expressway is about 183km long totally, with two-way 4 lanes, up to the
expressway standard.
Construction condition
This project is the important integral part of “One Loop”
and “One-crosswise” among the planned high-grade highway
network of Shandong Province, i.e. “five lengthwise highroads
connecting with four crosswise ones, and one loop around Shandong”,
starting from the Dezhou Round-city southern line on the north, terminating to
the border between Yanggu County and Fanxian County, on the way intersecting
with three east-to-west expressways such as Qihe-Xiajin Section of
Qingdao-Yinchuan Expressway - the national truck highway, Linqing-Xiajin
Expressway under the planning, and Liaocheng Section of Qingdao-Honjirap
Highway-the national key road and forming a fast through channel running from
north to south, at the same time organically connecting the highways within the
region so as to reach everywhere in all directions, which plays significant role
in improving the layout of regional highway network, suiting to growth of
traffic volume and bringing the whole benefits of highway network into play.
Total investment and fund resource
It is estimated that the total project investment is 771.08 million US
dollars, with the project capital not less than 35%.
Market and economic benefit analysis and forecast
The project’s internal rate of return is 8.1%, with about 17 years
of investment recovery period. With better economic benefits, this project can
have certain risk resistance capacity.
Liaison:
Add: No. 19, Shungeng Road, Jinan City
Post code: 65306; 250002
Person
to contact : Dong Yan, Mo Tao, Chang Ying
Tel: +86-531-5693095
2980940
Fax: +86-531-2973353 2973640
http: www.sdjt.gov.cn
E-mail: mut_gl@sdjt.gov.cn
(For more biz stories, please visit Industry Updates)