Global EditionASIA 中文双语Français
World
Home / World / Europe

Laying of last pipe of Nord Stream 2 pipeline completes

Xinhua | Updated: 2021-09-07 09:59
Share
Share - WeChat
This picture posted on the website of Russian energy giant Gazprom shows Nord Stream 2 pipe-laying operations in German territorial waters.

MOSCOW - The last pipe of the two strings of the Nord Stream 2 pipeline was welded, Nord Stream 2 AG, the operating company, said in a press release Monday.

"On September 6, 2021, specialists on the laybarge Fortuna welded the last pipe of the two strings of the Nord Stream 2 Pipeline," the company said.

"As the next step, the section of the pipe coming from the German shore will be connected to the section coming from the Danish waters in a so-called above water tie-in," it added.

The company intends to put the Nord Stream 2 gas pipeline into operation before the end of the year. It said the project will ensure gas supply security and reliability, and "contribute to meeting long-term needs of the European energy market for gas imports."

The 1,230-km gas pipeline would bring 55 billion cubic meters of gas annually from Russia to Germany through the Baltic Sea.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US